Piedmont Perfection | Freemodel

Piedmont Perfection

SOLD
$5,896,000
RENOVATION
$198,000
LOCATION
Piedmont, CA

Project Director: Megan Silver
Agent: Adrienne Krumins - The Grubb Co.

Freemodel’s scope of work for this project included:

  • All house: Replaced light fixtures throughout, installed smoke detectors, patched & painted walls, ceilings, vanities & trim, installed new wood flooring and refinished existing, installed baseboards.
  • Exterior: Powerwashed & painted exterior of the house, replaced window shutters in the backyard.
  • ADU Bath: Installed mirror, installed floor tile, installed vanity, installed toilet, refinished tub, installed new shower door.
  • Main Level Bath: Replaced pedestal sink & faucet, replaced mirror & accessories, installed toilet, refinished tub.
  • Powder Bath: Replaced batch accessories, installed toilet, installed mirror.
  • Primary Bath: Installed shower plumbing fixtures & patched the wall, installed sink faucet, installed vanity hardware, installed new shower door.
  • Upstairs Full Bath: Installed vanity hardware, installed mirror, installed toilet, installed bath accessories, installed tile flooring.
  • Upstairs Half Bath: Installed countertop & sink, installed bath accessories, installed cabinet hardware, installed sink faucet, installed baseboards.
  • Kitchen: Installed recessed lights, framed pantry, installed installed doors on new pantry, framed soffit above cabinets, removed trash compactor & installed flat panel to cover, installed cabinet hardware, installed countertops & sink, installed faucet, installed backsplash, installed cooktop, installed range, installed hood, installed refrigerator, installed dishwasher, installed double wall oven, painted cabinets.
  • ADU Kitchenette: Installed countertop, installed dishwasher, installed cabinet hardware.
  • Before

  • After