Freemodel’s scope of work for this project included:
- All house: Replaced light fixtures throughout, installed smoke detectors, patched & painted walls, ceilings, vanities & trim, installed new wood flooring and refinished existing, installed baseboards.
- Exterior: Powerwashed & painted exterior of the house, replaced window shutters in the backyard.
- ADU Bath: Installed mirror, installed floor tile, installed vanity, installed toilet, refinished tub, installed new shower door.
- Main Level Bath: Replaced pedestal sink & faucet, replaced mirror & accessories, installed toilet, refinished tub.
- Powder Bath: Replaced batch accessories, installed toilet, installed mirror.
- Primary Bath: Installed shower plumbing fixtures & patched the wall, installed sink faucet, installed vanity hardware, installed new shower door.
- Upstairs Full Bath: Installed vanity hardware, installed mirror, installed toilet, installed bath accessories, installed tile flooring.
- Upstairs Half Bath: Installed countertop & sink, installed bath accessories, installed cabinet hardware, installed sink faucet, installed baseboards.
- Kitchen: Installed recessed lights, framed pantry, installed installed doors on new pantry, framed soffit above cabinets, removed trash compactor & installed flat panel to cover, installed cabinet hardware, installed countertops & sink, installed faucet, installed backsplash, installed cooktop, installed range, installed hood, installed refrigerator, installed dishwasher, installed double wall oven, painted cabinets.
- ADU Kitchenette: Installed countertop, installed dishwasher, installed cabinet hardware.