Palo Alto Perfecto
$721,875 Profit
471% Return
SOLD
$3,825,000
AS-IS
$2,950,000
RENOVATION
$153,125
LOCATION
Palo Alto, CA
Project Director: Azary Khalfan
Agent: Anita Gat - KW Palo Alto
Freemodel’s scope of work for this project included:
- All Rooms: Hardwood floor refinished and stained to match new floors, patched & painted walls, ceiling, doors & trims, repaired foundation posts, closets water damage repaired, installed new door stoppers, removed all window treatments, replaced all floor vent covers, updated electrical outlets and switches, grounded all non-grounded electrical outlets, installed new CO and dual detectors
- Kitchen: Removed vinyl sheet flooring, removed mastic, applied sealant on floor, primed and painted using encapsulation paint, installed luxury vinyl flooring and baseboards, installed recessed ceiling lights, installed under cabinet lighting, rewired kitchen, moved dishwasher to left side of sink, installed new cabinets & hardware, installed undermount sink & faucet, installed disposal and switch, installed Quartz countertops, installed extended peninsula for countertop seating area with waterfall, installed backsplash, installed slide in range, installed hood over range, installed refrigerator with water and ice dispenser, installed dishwasher
- Dining Room: Removed vinyl sheet flooring, removed mastic, applied sealant on floor, primed and painted using encapsulation paint, installed luxury vinyl flooring and baseboards, damaged wood repaired in dining room corner, relocated dining room chandelier, patched and painted ceiling
- Family room: Removed vinyl sheet flooring, removed mastic, applied sealant on floor, primed and painted using encapsulation paint, installed luxury vinyl flooring and baseboards, replaced bell cover box, replaced ceiling light fixtures
- Living room: Painted fireplace bricks, painted mantel, painted inside fireplace
- Bathrooms: Sanded, primed, and painted bathroom vanities, replaced vanity lights
- Garage: Patched all walls in garage before painting, removed wall shelves in garage, organize wiring and electrical at garage door opener at the ceiling, installed x3 LED ceiling lights
- Exterior: Patched and painted walls, trims, and front door, painted cement in front door area, kitchen side door, and backside patio door area, patched cracks in concrete, removed all unnecessary hanging wires, replaced all exterior lights, replaced exterior outlet on back patio by sliding glass door, repaired security light at side of garage, upgraded electrical panel,
- Front: Front door lock repaired for a smoother function, checked switch to front porch light, wired for new lighting, connected to existing light switch, installed light fixture, ceiling mount exterior front
- Entrance hallway: Replaced return vent cover
- Primary bathroom: Covered pipe opening under sink with flange plate, patched damaged wood inside vanity for a unified look, caulked around sink/countertop edge, secured toilet, and sealed base
- Hallway bathroom: Installed two mirrors on both sides, glazed bathtub and surround tiles, caulked around edges, fixed damage under toilet, secured toilet, and sealed base, sanded and primed wooden trim by window edge
Before
After